Eaton Powerware 9390 Specifications Page 26

  • Download
  • Add to my manuals
  • Print
  • Page
    / 146
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 25
Installing the IAC
3-6
EATON Powerware
®
9390 IAC-B and IAC-T Installation and Operation Manual S 164201590 Rev C powerware.com
Figure 3-4. 100–160 kVA UPS with Line-up-and-Match IAC
3. If not already open, unfasten the IAC front door latch and swing the door open.
4. If not already removed, remove the door. Remove the retaining screws located
inside the door at the top and bottom hinge pivot points, then lift the door off.
Save the retaining screws for reinstallation of the door.
5. Remove the screws securing the internal safety shield panels, and remove the
panels to gain access to the inside of the cabinet.
6. Remove the field kit from the bottom of the cabinet and retain for later use.
7. If necessary, remove the cosmetic cover and hanger brackets from the right-hand
side of the UPS. Save the cover, screws, and brackets for later use.
8. If necessary, remove the cosmetic cover and hanger brackets from the left-hand
side of the IAC. Save the cover, screws, and brackets for later use.
9. Remove the knockouts, as required, on the bottom right side of the UPS cabinet
inside panel. Refer to the applicable Powerware 9390 Installation and Operation
manual, listed in paragraph 1.5, for the location of the knockout plug.
10. Remove the knockouts on the bottom left side of the IAC inside panel (see
Drawing 164201590-5, sheet 2 of 2 on page A-33).
Page view 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 145 146

Comments to this Manuals

No comments