Eaton Powerware 9390 Specifications Page 114

  • Download
  • Add to my manuals
  • Print
  • Page
    / 146
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 113
(SEE SHEET 12 of 22
FOR DETAILS)
AC INPUT FROM UPM 2
(A,B,C)
013106B
164201590---6
IAC POWER TERMINAL LOCATIONS
GROUND TERMINALS
DESCRIPTION:
DATE:
DRAWING NO: SHEET:
REVISION:
GROUND TERMINALS
NEUTRAL TERMINALS
(SEE SHEET 12 of 22 FOR DETAILS)
1+1 PARALLEL REDUNDANT CONFIGURATION
WITH OR WITHOUT SLB OPTION
AC INPUT FROM UPM 1
(A,B,C)
NOTE: 1. Metal shields covering wiring
terminals must be removed to gain
access to terminals.
2. 160/100 kVA model must be wired
for 120 kVA.
OPTIONAL SYSTEM LOAD
BREAKER (SLB)
MODULE OUTPUT
BREAKER 2 (MOB 2)
(SEE SHEET 13 of 22 FOR DETAILS)
AC OUTPUT TO CRITICAL
LOAD WITH SLB
(A,B,C)
MODULE OUTPUT
BREAKER 1 (MOB 1)
(SEE SHEET 12 of 22 FOR DETAILS)
AC OUTPUT TO CRITICAL
LOAD WITHOUT SLB
(A,B,C)
160/100, 160/120, AND 160/160 kVA 208V/208V
3of22
Installation Information
A-36 EATON Powerwar e
®
9390 IAC-B and IAC-T Installation and Operation Manual S 164201590 Rev C powerware.com
Page view 113
1 2 ... 109 110 111 112 113 114 115 116 117 118 119 ... 145 146

Comments to this Manuals

No comments