Eaton 93PM Installation Guide Page 43

  • Download
  • Add to my manuals
  • Print
  • Page
    / 93
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 42
P-164000249 30-200 kW 35
Revision 2 User's and Installation Guide
NOTE
The UPS cabinet is heavy. If unpacking instructions are not closely followed, the cabinet may
tip and cause serious injury.
The UPS cabinet is bolted to a wooden pallet supported by wood skids. To remove the pallet, perform
the following procedure:
1. If not already accomplished, use a forklift or other material handling equipment to move the
cabinet to the installation area, or as close as possible, before unloading from the pallet. Insert
the forklift jacks between the skids on the bottom of the unit.
2. Open the UPS package by forcing the locking pieces open in the corners of the package. Locking
pieces are also holding the ramp.
Make a visual inspection and check that there are no signs of shipping damages. The ‘Drop&Tell’
indicator on the rear side of the unit shall be intact if the equipment has been handled properly.
3. Unmount the ramp from the pallet and place it on the floor firmly against the pallet so that it can
be safely used for wheeling the UPS off the pallet.
4. If the leveling feet are not fully retracted, turn the leveling feet until they are retracted.
5. Unfasten front door latch and swing the door open.
6. Remove bolts and shipping brackets which are used to fasten the UPS to the pallet.
NOTE
After removing the shipping brackets, the unit must be immediately moved from the
pallet.
After removing the shipping brackets and retracting the leveling feet, the unit must not
be moved with a jack lift while still on pallet. Note that the UPS cabinet is heavy and
there are casters under the cabinet.
7. Slowly roll the cabinet toward the ramp edge. Be careful not to push the cabinet too much or
fast since it may cause the cabinet to tip.
8. Roll the cabinet to the final installation location.
9. Secure the UPS cabinet in position by lowering the levelling feet, until the cabinet is not resting
on the casters and the cabinet is level.
NOTE
If the cabinet is removed from its original installation location and transferred to a new
location on the pallet, the leveling feet must be lowered until the cabinet is not resting on
the casters. In addition, the shipping brackets must be attached to the cabinet and pallet.
Page view 42
1 2 ... 38 39 40 41 42 43 44 45 46 47 48 ... 92 93

Comments to this Manuals

No comments