INSTALLING THE UPS SYSTEM
EATON Powerware
®
9315 UPS (500–750 kVA) Installation and Operation Manual S 164201691 Rev 2 www.powerware.com
3-8
Installation Checklist
- All packing materials and restraints have been removed from each cabinet.
- Each cabinet in the UPS system is placed in its final installation location.
- A ground bond is installed between any cabinets that are bolted together.
- All switchboards, conduits, and cables are properly routed to the UPS and auxiliary cabinets.
- All power cables are properly sized and terminated.
- A ground conductor is properly installed.
- If a bypass input neutral connection is used, no other N‐G bonds exist downstream from the UPS.
- Battery cables and harnesses are terminated on E4 and E5.
- Internal battery cabinet connections have been completed (bus bars, plugs, etc.).
- Shunt trip signal wiring is connected from UPS to battery breaker(s).
- Air conditioning equipment is installed and operating correctly.
- The area around the UPS system is clean and dust‐free. (It is recommended that the UPS be installed on a level,
sealed concrete pad or floor.)
- Adequate workspace exists around the UPS and other cabinets.
- Adequate lighting is provided around all UPS equipment.
- A 120V service outlet is located within 7.6m (25 ft) of the UPS equipment.
- Each Remote Monitor Panel (RMP) is mounted in its installed location. (OPTIONAL)
- The control wiring for each RMP is terminated inside the UPS cabinet. (OPTIONAL)
- The remote emergency power-off (REPO) device is mounted in its installed location and its wiring terminated inside
the UPS cabinet. (OPTIONAL)
- Summary alarms and/or building alarms are wired appropriately. (OPTIONAL)
- A Relay Interface Module (RIM) is mounted in its installed location and its wiring is terminated inside the UPS cabinet.
(OPTIONAL)
- A remote battery disconnect control is mounted in its installed location and its wiring is terminated inside the UPS and
battery cabinets. (OPTIONAL)
- Circuit breakers with adjustable trip mechanisms adjusted to match site requirements.
- Debris shields covering ventilation grills are removed from all cabinets.
- Startup and operational checks are performed by an authorized Eaton Customer Service Engineer.