Eaton POWERWARE 9315 Instruction Manual Page 146

  • Download
  • Add to my manuals
  • Print
  • Page
    / 206
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 145
DESCRIPTION:
DRAWING NO:
3 of 6
INSTALLATION NOTES
SHEET:
NOTE: Customer ground, size 2/0, can be
run in any conduit listed in Table C.
164201150−1
A−4
EATON Powerware 9315 Parallel Capacity/Redundant System
164201150 Rev. E www.powerware.com
Table C. Power Cable Terminations and Conduit Requirements
Powerware 9315 1200A System Bypass Module
Terminal Function Terminal Function Bus Landings
Tightening
Torque
N-M (lb-ft)
Bolt/Int.
Hex Size
(In.)
AC Input from UPS
Output to SBM
E8 Phase A 8 − 2 bolt mounting 76 (56) 1/2
E9 Phase B 8 − 2 bolt mounting 76 (56) 1/2
E10 Phase C 8 − 2 bolt mounting 76 (56) 1/2
AC Input to SBM
Bypass
E1 Phase A 8 − 2 bolt mounting 76 (56) 1/2
E2 Phase B 8 − 2 bolt mounting 76 (56) 1/2
E3 Phase C 8 − 2 bolt mounting 76 (56) 1/2
AC Input from SBM
to optional SMB
E8 Phase A 4 − 4/0-500 kcmil
Pressure Termination
42.4(32.2) 3/8
E9 Phase B 4 − 4/0-500 kcmil
Pressure Termination
42.4(32.2) 3/8
E10 Phase C 4 − 4/0-500 kcmil
Pressure Termination
42.4(32.2) 3/8
AC Input to
optional SMB
Bypass
E1 Phase A 4 − 4/0-500 kcmil
Pressure Termination
42.4(32.2) 3/8
E2 Phase B 4 − 4/0-500 kcmil
Pressure Termination
42.4(32.2) 3/8
E3 Phase C 4 − 4/0-500 kcmil
Pressure Termination
42.4(32.2) 3/8
AC Output from
SBM or optional
SMB to Critical
Load
E5 Phase A 8 − 2 bolt mounting 76 (56) 1/2
E6 Phase B 8 − 2 bolt mounting 76 (56) 1/2
E7 Phase C 8 − 2 bolt mounting 76 (56) 1/2
SBM Neutral E4 Neutral 26 − 2 bolt mounting 76 (56) 1/2
SBM Customer
Ground
Frame
Ground
Ground 26 − 1 bolt mounting 76 (56) 1/2
SMB Neutral E4 Neutral 8 − 2 bolt mounting 76 (56) 1/2
SMB Customer
Ground
Frame
Ground
Ground 14 − 1 bolt mounting 76 (56) 1/2
Page view 145
1 2 ... 141 142 143 144 145 146 147 148 149 150 151 ... 205 206

Comments to this Manuals

No comments