TIE CABINET INSTALLATION
Eaton 9355 Tie Cabinet (20/30 kVA) Installation Guide S 164201630 Rev B www.eaton.com/powerquality
9
7. Punch holes for the conduit (AC input, UPS output, load connection, and
maintenance bypass contact wires) using a Greenlee
®
punch or similar device.
8. Verify that the Tie Cabinet bypass breaker is in the OFF position (see Figure 4).
Figure 4. Tie Cabinet Bypass Breaker
9. Mount the Tie Cabinet to the wall and install the conduit.