
UPS STARTUP
Eaton FERRUPS FE/QFE UPS (500 VA–18 kVA) User's Guide S 164201404 Rev C
19
RS-232
Communication
Port
ON/OFF Switch
Output
Receptacles
Alarm Silence
Switch
Figure 4. FERRUPS 1.8–3.1 kVA Rear Panel
To start the FE/QFE 500 VA–3.1 kVA UPS, use the following steps:
1. Confirm the equipment to be protected by the UPS is powered off.
2. For FE Plug-Receptacle UPSs: Plug the UPS power cord into a
power outlet.
NOTE If the plug does not match your receptacle outlet, ask your electrician to install the
proper outlet.
For QFE Plug-Receptacle UPSs: Disconnect the power cord from
the computer or other equipment to be protected by the UPS and
plug it into the UPS. Plug the other end of the power cord into a
power outlet.
NOTE Do not use the cord supplied with the UPS; this cord is for plugging the equipment
into the UPS output receptacles.
NOTE If the plug does not match your receptacle outlet, ask your electrician to install the
proper outlet.
For Hardwired UPSs: Confirm that an electrician has completed
and tested the connection to the proper power source and
connected your protected equipment according to the Eaton
FERRUPS FE/QFE UPS (500 VA–18 kVA) Installation Guide. Turn
the AC line disconnect switch to the ON position.
Comments to this Manuals